| |
TM 9-2350-287-20-2
SECTION II MAINTENANCE ALLOCATION CHART
FOR
CARRIER, AMMUNITION, TRACKED,
M992A1
(1)
Group
Number
(2)
Component Assembly
(3)
Maintenance
Function
(4)
Maintenance Level
(5)
Tools and
Equipment
(6)
Remarks
C
O
F
H
D
Projectile Rack Canister
Inspect
0.1
1, 2, 6
Stowage Boxes, Braces,
Replace
0.8
and Rack Removal Aid
Repair
0.5
Right Rear Canister
Inspect
0.1
1, 2, 6
Compartment Shelving,
Replace
0.8
155 mm Charges
Repair
0.5
Left Rear Canister
Inspect
0.1
1, 2, 6
Compartment Shelving
Replace
0.8
Repair
0.5
Left Rear Canister
Replace
0.3
1,2, 6
Compartment Wear Strips
Repair
0.3
and Guard
Left Rear Canister
Inspect
0.1
1, 2, 4, 6
Compartment Restraint
Lubricate
0.1
Bar Assembly
Replace
0.1
Repair
0.2
0.5
Right Rear Canister
Inspect
0.1
1, 2, 4, 6
Compartment Restraint
Lubricate
0.1
Bar Assembly
Replace
0.1
Repair
0.2
0.5
Telephone Cable Reel
Lubricate
0.1
1, 2, 6
and Guide with Hand
Replace
0.3
Crank
Repair
0.5
Mounted Water Ration
Replace
0.5
2, 6
Heater (MWRH) Bracket
Repair
0.5
22
BODY, CHASSIS, AND
HULL ASSOCIATED
ITEMS
2201
Shroud Assembly
Inspect
0.1
4, 6
Replace
0.2
Repair
0.5
2202
Heating and Ventilating
Replace
0.7
1, 2, 6
Duct
Change 1 B-15
|