Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: b. INSTALLATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2350-287-20-2 21-14.  CREW  AFES  OPTICAL  FIRE  SENSING  APPARATUS  (OFSA)  REPLACEMENT (continued). b. INSTALLATION CAUTION Install OFSA in same position as noted at removal. Failure to do so can result in failure of  OFSA  to  detect  fires. 1. Position OFSA (1) on bracket (7) between scribed marks. 2. Install OFSA (1) on bracket (7) with two screws (3), four washers (4), two new lockwashers (5), and two nuts (6). 3. Install electrical cable (2) on OFSA (1 ). 4. Clean OFSA lenses with lens paper. FOLLOW-ON MAINTENANCE: Reactivate crew AFES (para 21-3). 21-53

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business