| |
TM 9-2350-287-20-2
17-28. HYDRAULIC CONTROL PANEL ASSEMBLY REPAIR (continued).
2.
Install hydraulic subplate (49) and two screws (89), washers (100), new lockwashers (101), and nuts (102) on
hydraulic control panel assembly (1).
3.
Install ballistic shield directional control valve (84) and subplate relief valve assembly (82) on hydraulic subplate
(49).
4.
Install two new packings (81 and 83) and four screws (85) on ballistic shield directional control valve (84).
5.
[Step Deleted]
6.
Install hydraulic subplate (36) and two screws (96), washers (97), new lockwashers (98), and nuts (99) on
hydraulic control panel assembly (1).
7.
Install conveyor directional control valve (94) on hydraulic subplate (36). Install two new packings (95) and four
screws (93) on conveyor directional control valve (94).
8.
[Step Deleted]
9.
Install gage panel assembly (78) on hydraulic control panel assembly (1). Install four new lockwashers (79) and
screws (80) on gage panel assembly (78).
Change 1 17-88
|