| |
TM 9-2350-287-20-2
17-10. ROLLER ASSEMBLY REPAIR.
This Task Covers:
a. Removal
b. Disassembly
c. Assembly
d. Installation
Initial Setup:
Tools/Test Equipment:
Equipment Conditions:
l General mechanics tool kit (Item 24,
l Vehicle parked on level ground (refer to
Appendix l)
TM 9-2350-287-10).
l Conveyor deployed (refer to
Materials/Parts:
TM 9-2350-287-10).
l Lockwasher (8) (Item 196, Appendix H)
l Conveyor dead-end section folded up (refer to
l Spring pin (Item 355, Appendix H)
TM 9-2350-287-10).
a.
REMOVAL
NOTE
Roller assembly in conveyor drive-end section
takeup-end section are replaced the same way.
Remove eight screws (7) and Iockwashers (6) and roller
Iockwashers.
b.
DISASSEMBLY
NOTE
and roller assembly in conveyor
bracket (4) from conveyor assembly (5). Discard
Repeat steps 1 through 3 to disassemble both convey or drive-end section and takeup-
end section roller assemblies.
1.
Using driftpin, drive out spring pin (8) from roller shaft (1) and roller bracket (4). Discard spring pins.
2.
Remove roller shaft (1) and roller (3) from roller bracket (4).
3.
Remove two bearing sleeves (2) from roller (3).
c.
ASSEMBLY
NOTE
Repeat steps 1 and 2 to assemble both conveyor drive-end section and takeup-end
section roller assemblies.
1.
Install two bearing sleeves (2) in roller (3).
17-24
|