| |
TM 8-2350-287-20-2
16-10. PERSONNEL HEATER EXHAUST TUBE REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
Initial Setup:
Tools/Test Equipment:
l General mechanic's tool kit (Item 24,
Appendix I).
Matetials/Parts:
l Lockwasher (5) (Item 175, Appendix H)
Equipment Conditions:
l Left and right projectile rack assemblies moved
to rear of vehicle (refer to TM 9-2350-287-10).
l Numbers 1 and 2 engine AFES cylinder bottles
removed (para 21-4).
l Numbers 1 and 2 engine AFES cylinder bottle
bracket straps, brackets, and mounts removed
(para 21-8).
l Personnel heater removed (para 16-7).
l Exhaust deck removed (para 15-8).
l Fan access door removed (para 15-6).
a.
1.
2.
3.
4.
b.
1.
2.
3.
4.
REMOVAL
Remove two nuts (12), muffler clamp (15), and bracket (13) from exhaust tube (10) and crossover pipe (14).
Remove three screws (9), Iockwashers (8), and nuts (7) and exhaust tube (10) from vehicle bulkhead (11)
inside crew compartment. Discard lockwashers.
Remove two nuts (1), muffler clamp (6), bracket (2), and crossover pipe (14) from exhaust outlet tube (5).
Remove two screws (3) and lockwashers (4) and exhaust outlet tube (5) from vehicle bulkhead (11). Discard
lockwashers.
lNSTALLATION
install exhaust outlet tube (5) on vehicle bulkhead (11) with two screws (3) and new Iockwashers (4).
Install crossover pipe (14) into exhaust outlet tube (5) and secure with muffler clamp (6), bracket (2), and two
nuts (1).
Install exhaust tube (10) on vehicie bulkhead (11) with three screws (9), new Iockwashers (8), and nuts (7).
Position crossover pipe (14) on exhaust tube (10) and secure with muffler clamp (15), bracket (13), and two
nuts (12).
16-22
|