| |
TM 9-2350-287-20-2
15-83. PROJECTILE RACK REPLACEMENT (continued).
b.
DISASSEMBLY
NOTE
Each rack assembly consists of five
projectile rack sections. To completely
disassemble or assemble a rack
assembly, repeat the procedure five
times.
1.
Remove two rods (15) from projectile rack
section (14).
NOTE
Step 2 applies to top rack section
only.
2.
Remove projectile rack stowage box (12)
from top of rack section (14).
3.
Remove 12 nuts (18), washers (16), lock-
washers (17), and screws (20) and two trays
(19 and 21) from right projectile rack canister
stowage box (12). Discard Iockwashers.
NOTE
Note order of rack section removal.
To ensure that rear rack restraints will
engage properly, make sure rack
sections are stacked in same order
as removed.
4.
Remove two rods (15) from rack section (14).
c.
ASSEMBLY
NOTE
Make sure rack restraint is on back of
third and fifth racks from bottom.
1.
Stack rack sections (14), making sure
interlocking blocks (13) engage properly.
2.
Install two rods (15) in each rack section (14).
1 5 - 2 0 6
|