Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 15-83. PROJECTILE RACK REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM   9-2350-287-20-2 15-83.  PROJECTILE  RACK  REPLACEMENT. This Task Covers: a.    Removal b.  Disassembly c.   Assembly d.  Installation Initial  Setup: Tools/Test   Equipment: Equipment Conditions: l Five-ton hoist (Item 23, Appendix 1) • Vehicle parked on level ground l General mechanic’s tool kit (Item 24, (refer to TM 9-2350-287-10). Appendix  1) l Top doors opened (refer to TM 9-2350-287-10). Materials/Parts: l Right projectile rack stowage box guard plate l Lockwasher (2) (Item 164, Appendix H) assembly removed (para 15-81). l Lockwasher (12) (item 196, Appendix H) Personnel  Required:  Two a. REMOVAL WARNING Projectile  rack  sections  must be empty before attempting to move  either  projectile  rack assembLy.  Dropped  projectiles may explode, causing injury or death to personnel. 1. Place NOTE To ease removal, projectile rack stowage boxes must be empty before  attempting  to  move  either rack  assembly. An   assistant   is   needed   for removing  and  installing  stowage boxes. hook  (2)  of  five-ton  hoist  on  bar  (1)  of projectile rack assembly (3). 2. Remove two rods (4) from bottom of rack assembly (3). 15-203

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business