| |
TM 9-2350-287-20-2
15-83. PROJECTILE RACK REPLACEMENT.
This Task Covers:
a. Removal
b. Disassembly
c. Assembly
d. Installation
Initial Setup:
Tools/Test Equipment:
Equipment Conditions:
l Five-ton hoist (Item 23, Appendix 1)
• Vehicle parked on level ground
l General mechanic’s tool kit (Item 24,
(refer to TM 9-2350-287-10).
Appendix 1)
l Top doors opened (refer to
TM 9-2350-287-10).
Materials/Parts:
l Right projectile rack stowage box guard plate
l Lockwasher (2) (Item 164, Appendix H)
assembly removed (para 15-81).
l Lockwasher (12) (item 196, Appendix H)
Personnel Required: Two
a.
REMOVAL
WARNING
Projectile rack sections must
be empty before attempting to
move either projectile rack
assembLy. Dropped projectiles
may explode, causing injury or
death to personnel.
1.
Place
NOTE
To ease removal, projectile rack
stowage boxes must be empty
before attempting to move either
rack assembly.
An assistant is needed for
removing and installing stowage
boxes.
hook (2) of five-ton hoist on bar (1) of
projectile rack assembly (3).
2.
Remove two rods (4) from bottom of rack assembly
(3).
15-203
|