| |
TM 9-2350-287-20-2
15-82. PROJECTILE RACK BASE, SUPPORTS, AND VEHICLE WALL-MOUNTED
RESTRAINTS REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
Initial Setup:
Tool/Test Equipment:
• General mechanic’s tool kit (Item 24,
Appendix 1)
Materials/Parts:
• Lockwasher (6) (Item 164, Appendix H)
• Lockwasher (31) Item 166, Appendix H)
l Lockwasher (16) Item 168, Appendix H)
Personnel Required: Two
Equipment Conditions:
l Vehicle parked on level ground
(refer to TM 9-2350-287-10).
l Projectile rack assemblies moved to rear of
vehicle (refer to TM 9-2350-287-10).
l Heating and ventilation duct removed
(para 16-2).
a.
REMOVAL
l
•
l
NOTE
Projectile rack assembly restraints and supports are adjustable. For correct installation
of projectile rack assemblies, scribe marks on vehicle wall before removing restraints and
supports.
For correct installation of projectile rack assembly restraints, record the number,
thickness, and location of shims.
An assistant is needed to hold projectile rack assembly restraints and supports when they
are removed or installed.
1.
Remove 16 screws (1), Iockwashers (2), and washers (3), shims (4), and four rear rack restraints (5,6,11 and
12) from vehicle wall. Discard Iockwashers.
2.
Remove four screws (7), Iockwashers (8), and washers (9) and bracket (10) from forward bulkhead, Discard
Iockwashers.
15-198
|