15-81. PROJECTILE RACK STOWAGE BOX GUARD PLATE ASSEMBLY REPLACEMENT
(continued).
b.
1.
2.
3.
4.
5.
c.
1.
2.
3.
4.
5.
d.
1.
2.
3.
DISASSEMBLY
Remove eight self-locking nuts (9), 16 washers (10), fourplates (11) and supports (1 4), eight screws (16), and
two guard plates (5 and 6) from two pivot bars (3). Discard self-locking nuts.
Remve two screws (19) and S-hooks (21) from bar (22) and guard plate (6).
Remove chain (20) from each of two quick-release pins (4).
Remove self-locking nut (12), washer (13), two washers (17), bar (22), and screw (18) from guard plate (5).
Discard self-locking nut.
Remove two straps (8) and two straps (7) from two stowage boxes (1 and 2).
ASSEMBLY
Install two straps (8) and two straps (7) on two stowage boxes (1 and 2).
Install screw (18), bar (22), two washers (17), washer (13), and new self-locking nut (12) on guard plate (5).
Install chain (20) on each of two quick-release pins (4).
Install two S-hooks (21) on guard plate (6) and on bar (22) with two screws (19).
Install two guard plates (5 and 6) on two pivot bars (3) using eight screws (16), four supports (14) and plates
(11), 16 washers (10), and eight new self-locking nuts (9).
INSTALLATION
Grasp each of two pivot bars (3) and push straight in to install two guard plates (5 and 6) on two stowage boxes
(1 and 2).
Fold up two guard plates (5 and 6) and secure with two quick-release pins (4) on two brackets (3).
If holes on plates (5 or 6) and brackets (3) do not line up, add or remove shims (2) on brackets (3) until holes
are alined and pins (4) fit freely.
15-196
|