| |
TM 9-2350-287-20-2
15-18. TOP RIGHT DOOR REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
Initial Setup:
Tools/Test Equipment:
• Endless sling (Item 20, Appendix 1)
• Five-ton hoist (Item 23, Appendix 1)
• General mechanic’s tool kit (Item 24,
Appendix I)
Materials/Parts:
• LockWasher (10) (Item 164, Appendix H)
• Self-locking nut (Item 323, Appendix H)
Personnel Required: Two
Equipment Conditions:
• Vehicle parked on level ground (refer to
TM 9-2350-287-10).
• Top middle door opened (refer to
TM 9-2350-287-10).
a.
REMOVAL
1.
Remove screw (6), self-locking nut (5), two washers (4), and bar (2) from bracket (3). Allow bar (2) to hang
from support (l). Discard self-locking
nut.
15-37
|