| |
TM 9-2350-287-20-2
15-11. FRONT AND SIDE HULL SLOPE PLATES REPLACEMENT (continued).
8.
9.
10.
b.
1.
2.
3.
4.
5.
6.
7.
8.
Remove seven screws (15) and washers (14) from sick
Remove six screws (17) from side hull slope plate (16).
hull slope plate (16).
WARNING
Side hull plate is very heavy. At least three persons are required to lift it from vehicle.
Failure to follow this warning can result in injury to personnel.
With at least two assistants, lift side hull slope plate (16) from vehicle.
IiNSTALLATION
WARNING
Side hull slope plate is very heavy. At least three persons are required to install it on
vehicle. Failure to follow this warning can result in injury to personnel.
With at least two assistants, lift side hull slope plate (16) into position on vehicle.
Aline holes in side hull slope plate (16) with holes in hull.
NOTE
Do not tighten screws until both plates have been installed. Some maneuvering of
plates may be necessary, to make sure all decks and plates fit properly.
Install six screws (17) in side hull slope plate (16).
Install seven screws (15) and washers (14) on side hull slope plate (16).
Loop sling around front hull slope plate (8). Attach sling to hoist, and take up slack.
WARNING
Personnel must stand clear during lifting operations. A swinging or shifting load can
cause injury.
NOTE
Two assistants are required to help aline holes in front hull slope plate.
Lift front hull slope plate (8) onto vehicle. Aline holes in front hull slope plate (8) with holes in hull and holes
in side hull slope plate (1 6).
install three washers (12) and screws (13) in front hull slope plate (8) and side hull slope plate (16).
Install seven washers (10) and screws (11) in front hull slope plate (8).
15-23
|