TM 9-2350-287-10PROPELLING-CHARGE STOWAGE AREAS (continued)Restraint SystemStraps (1) on canister shelves secure canisters at each shelf. These straps pass over canisters and must be loosened orremoved before canisters can be loaded or unloaded. In most cases these straps do not have to be moved to removecharges from canisters.Restraint bars (2) on right and left rear canister stowage shelves secure canisters for transit. These bars must beremoved when canisters are loaded or unloaded. They must also be removed when charges are taken from canisters.Loading Propelling-Charge Canisters1. Open canister side doors (p. 2-134) and/or deploy conveyor (p. 2-150).2. Load propelling-charge canisters via conveyor (p 2-157) or canister compartment sidedoors.2-174
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business