TM 9-2350-277-34
REPLACE CABLE ASSEMBLY W115 (M1068A3 ONLY)
0107 00
THIS WORK PACKAGE COVERS:
Removal (page 0107 00-1).
Installation (page 0107 00-3).
INITIAL SETUP:
Maintenance Level
Direct Support
Tools and Special Tools
Electronic Equipment Tool Kit (WP 0120 00, Item 61)
Materials/Parts
Lockwasher (14)
Strap
Personnel Required
Radio Repairer 29E10
Helper (H)
References
See your -20
Equipment Condition
External communication box removed (see your -20)
REMOVAL
1.
Open and secure lid (1) on external communication box (2).
2.
Remove 14 screws (3), lockwashers (4), and faceplate (5) from external communication box (2). Discard lockwashers.
NOTE
Tag leads before disconnecting from binding posts.
3.
Remove binding posts (6) and 16 leads (7) from external communication box (2).
4.
Remove screws (8) and clamps (9) from weldnuts (10), as required.
5.
Remove and discard straps (11), as required.
6.
Disconnect cable assembly W115, plug P106 (12) from jack J136 (13) on signal patch panel box (14).
0107 00-1