TM 9-2350-277-34
REPAIR POWER PLANT SLING Continued
0067 00
2.
Inspect beam assembly (5) for undercut, overlap, surface cavities, surface cracks in weld metal, or in heat-affected zone
of base metal, and lack of weld penetration defects.
FOLLOW-THROUGH STEPS
1.
Test load power plant sling (WP 0066 00).
2.
Complete required forms.
END OF TASK