TM 9-2350-277-34REPAIR POWER PLANT SLING — Continued 0067 002. Inspect beam assembly (5) for undercut, overlap, surface cavities, surface cracks in weld metal, or in heat-affected zoneof base metal, and lack of weld penetration defects.FOLLOW-THROUGH STEPS1. Test load power plant sling (WP 0066 00).2. Complete required forms.END OF TASK0067 00-5/6 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business