Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
Table 1
REPLACE ENGINE Continued - TM-9-2350-277-34_124
TM-9-2350-277-34 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
88
89
90
91
92
93
94
95
96
97
98
TM 9-2350-277-34
REPLACE ENGINE
0015 00
THIS WORK PACKAGE COVERS:
Removal (page 0015 00-1).
Installation (page 0015 00-19).
INITIAL SETUP:
Maintenance Level
Direct Support
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0120 00, Item 62)
Engine and Transmission Sling (WP 0120 00, Item 52)
Plastic Face Hammer (WP 0120 00, Item 15)
Hammer Face Holder (WP 0120 00, Item 22)
Lifting device with rated capacity of 1700 lbs (772 kg)
Magnetic Base
Dial Indicator
(WP 0120 00, Item 24)
Torque
Wrench (WP 0120 00, Item 73)
Materials/Parts
Antifreeze (WP 0122 00, Item 4)
Antiseize Compound (WP 0122 00, Item 5)
Engine and transmission oil (WP 0122 00, Item 13)
Hydraulic fluid (WP 0122 00, Item 16)
Cotter pin
Gasket
Locknut
Locknut
Locknut
Locknut
Locknut
Locknut (2)
Locknut (2)
Locknut (2)
Locknut (3)
Lockwasher
Lockwasher
Lockwasher
Lockwasher (2)
Lockwasher (3)
Packing
Self-locking bolt (10)
Tie strap (7)
Personnel Required
Track Vehicle Repairer 63H10
Helper (H)
References
See your -10
See your -20
E
quipment
Condition
Power plant removed (see your -20)
Power plant on the power plant stand (WP 0068 00)
Engine oil drained (see your -20)
Hydraulic fluid drained (see your -20)
Engine wiring harness removed (see your -20)
REMOVAL
1.
Remove nut (8), lockwasher (9), ground lead (5) and circuit lead 771 (6) from
generator
(7). Discard lockwasher.
0015 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business