TM 9-2350-277-20-6REPLACE POWER CONTROL ENCLOSURE AC AND DC METERS AND LIGHTINDICATORS (M1068A3 ONLY) — Continued0827 00INSTALLATION1. If bulb (1) or lens (2) were removed, install on indicator light (3).2. Install two indicator lights (3) on faceplate (4). Secure with lockwashers (5) and jamnuts (6).3. Install meter M2 (7) on faceplate (4). Secure with three screws (8) and new locknuts (9).4. Install meter M1 (10) on faceplate (4). Secure with three screws (8) and new locknuts (9).5. Install circuits 32F (11) and 28C leads (12), washer (13), and nut (14) on negative (-) terminal of meter M2 (7).6. Install circuit 31F lead (15), washer (13), and nut (14) on positive (+) terminal of meter M2 (7).7. Install circuit 30A lead (16), washer (17), and nut (18) on terminal 1 of meter M1 (10).8. Install circuit 29A lead (19), washer (17), and nut (18) on terminal 2 of meter M1 (10).0827 00-4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business