TM 9-2350-277-20-6REPLACE SIGNAL PATCH PANEL BOX A10 (M1068A3 ONLY) — Continued 0816 00INSTALLATION1. Install four leads (5) on rear of patch panel box (3).2. Install five cables (4) to connectors on rear of patch panel box (3).3. Install patch panel box (3), four new lockwashers (2), and screws (1) on hull top.FOLLOW-THROUGH STEPS1. Connect battery ground lead (WP 0338 00).END OF TASK0816 00-2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business