TM 9-2350-277-20-6
REPLACE STE/ICE DISTRIBUTION BOX (M113A3, M901A3, AND M1059A3 ONLY)
Continued
0874 00
3.
Untape and install two negative battery leads (6) on shunt (7). Secure with two new lockwashers (8) and screws (9).
4.
Install shunt guard (WP 0868 00).
5.
Slide spall liners back into place.
FOLLOW-THROUGH STEPS
1.
Connect battery ground strap (WP 0337 00).
END OF TASK
0874 00-5/6 blank