TM 9-2350-277-20-5REPLACE COOLANT HEATER WIRING HARNESS — Continued 0735 0010. Connect main wiring harness 402A lead (13) to coolant heater wiring harness lead (14).FOLLOW-THROUGH STEPS1. Install coolant heater and pump unit (WP 0728 00).2. Connect battery ground strap (WP 0337 00), (WP 0338 00), or (WP 0339 00).3. Close power plant access door (see your -10).4. Raise trim vane (see your -10).END OF TASK0735 00-7/8 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business