Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION - TM-9-2350-277-20-5_285
REMOVAL - TM-9-2350-277-20-5_288
TM-9-2350-277-20-5 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
218
219
220
221
222
223
224
225
226
227
228
TM 9-2350-277-20-5
REPLACE PERSONNEL HEATER FUEL PUMP TO BULKHEAD
CONNECTION HOSE (M901A3 ONLY)
0693 00
THIS WORK PACKAGE COVERS:
Removal (page 0693 00-2).
Installation (page 0693 00-3).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Materials/Parts
Wiping rag (WP 0928 00, Item 65)
Personnel Required
Unit Mechanic
References
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Ramp lowered (see your -10)
Battery ground strap disconnected (WP 0337 00)
Heater duct removed (WP 0706 00)
Front floor plates removed (WP 0540 00)
Heater
fuel shutoff valve
closed (see your -10)
0693 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business