TM 9-2350-277-20-4REPLACE OIL CAN BRACKET 0574 00THIS WORK PACKAGE COVERS:Removal (page 0574 00-1).Installation (page 0574 00-1).INITIAL SETUP:Maintenance LevelUnitTools and Special ToolsGeneral Mechanic’s Tool Kit (WP 0926 00, Item 65)Torque Wrench (WP 0926 00, Item 84)Personnel RequiredUnit MechanicReferencesSee your -10Equipment ConditionEngine stopped (see your -10)Carrier blocked (see your -10)Trim vane lowered (see your -10)Power plant access door open (see your -10)REMOVAL1. Remove two screws (1), washers (2), and oil can bracket (3) from power plant compartment.INSTALLATION1. Align oil can bracket (3) with bulkhead in power plant compartment. Secure with two washers (2) and screws (1).TIGHTEN SCREWS TO 22-24 LB-FT (30-33 N m) TORQUE.FOLLOW-THROUGH STEPS1. Close power plant access door (see your -10).2. Raise trim vane (see your -10).END OF TASK0574 00-1/2 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business