TM 9-2350-277-20-4REPLACE SPALL LINER ON RAMP (M113A3 ONLY) — Continued 0512 00INSTALLATION1. Place spall liner (4) on ramp. Secure with six retainers (3) (if equipped), 12 washers (2), new lockwashers (if equipped),and screws (1). TIGHTEN SCREWS TO 32-34 LB-FT (43-46 N m) TORQUE.FOLLOW-THROUGH STEPS1. Start engine (see your -10).2. Raise and lock ramp (see your -10).3. Stop engine (see your -10).END OF TASK0512 00-2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business