TM 9-2350-277-20-4
REPLACE SPALL LINER ON RAMP (M113A3 ONLY) Continued
0512 00
INSTALLATION
1.
Place spall liner (4) on ramp. Secure with six retainers (3) (if equipped), 12 washers (2), new lockwashers (if equipped),
and screws (1). TIGHTEN SCREWS TO 32-34 LB-FT (43-46 N m) TORQUE.
FOLLOW-THROUGH STEPS
1.
Start engine (see your -10).
2.
Raise and lock ramp (see your -10).
3.
Stop engine (see your -10).
END OF TASK
0512 00-2