TM 9-2350-277-20-4
RAISE AND LOWER POWER PLANT GRILLE Continued
0464 00
CAUTION
Of the 14 screws removed, one is the lifting eye screw and two are coarse threaded screws.
Make sure the different screws are installed in their proper places.
6.
Secure grill (1) to hull (2) with 14 screws (3) and washers (4). TIGHTEN LIFTING EYE SCREW TO 175-200 LB-FT
(237-271 N m) TORQUE. TIGHTEN TWO COARSE THREADED SCREWS TO 151-166 LB-FT (205-225 N m)
TORQUE. TIGHTEN 11 SCREWS TO 100-120 LB-FT (136-163 N m) TORQUE.
7.
Secure power plant front access door (5) in open position with door brace (6).
8.
Connect cannon plug of headlight wiring harness (7) to hull (8).
9.
Connect auxiliary fluid detector (1) on auxiliary tank (2) to cable (3).
0464 00-14