TM 9-2350-277-20-4
REPAIR TRIM VANE CONTROL LINKAGE Continued
0461 00
ASSEMBLY
1.
Install eyebolt (11) and catch (8) on extension (14). Secure with screw (13) and new locknut (12).
2.
Install nut (10), bracket (9), and clevis (3) on eyebolt (11).
3.
Install spring (7) on catch (8) and bracket (9).
4.
Install pivot bracket (4) on hull. Secure with two screws (5) and washers (6). Tighten screws to 32-34 ft-lb
(43-46 N.m) torque.
5.
Position trim vane control linkage on carrier with clevis(3) aligned with pivot bracket (4).
6.
Install pin (2) in clevis (3) and pivot bracket (4). Secure with new cotter pin (1).
7.
Adjust clevis (3) to provide overcenter lock in retracted position.
8.
Adjust trim vane quick release to provide overcenter lock in retracted position.
END OF TASK
0461 00-3/4 blank