TM 9-2350-277-20-3REPLACE FINAL DRIVE — Continued 0403 00INSTALLATION1. Check final drive drain plug for tightness.2. If left final drive is to be replaced, remove speedometer shaft adapter from old final drive and install it in new final drive(WP 0860 00).3. Fill final drive with oil (WP 0155 00).4. Secure lifting bar (1) to final drive (2) with two sprocket mounting screws (3).5. Attach lifting device of at least 165 lb (75 kg) capacity to lifting bar (1) and position final drive (2) on hull (6).6. Apply antiseize compound to threads of 17 screws (4).7. Secure final drive (2) to hull (6) with 17 screws (4) and washers (5). TIGHTEN SCREWS TO 75-85 LB-FT (102-115N m) TORQUE.8. Remove two screws (3) and lifting bar (1) from final drive (2).FOLLOW-THROUGH STEPS1. Install final drive yoke (WP 0405 00).2. Install drive sprocket on final drive (WP 0422 00).3. Install track on drive sprocket (WP 0422 00).4. Install track shroud (WP 0438 00).5. Install speedometer cable on adapter (left final drive only) (WP 0422 00).6. Install hull front access cover (left final drive only) (WP 0449 00).7. Close power plant front access door (see your -10).8. Raise trim vane (see your -10).9. Remove blocks used to keep carrier from moving (see your -10).10. Road test carrier (WP 0155 00) to check final drive.END OF TASK0403 00-3/4 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business