Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION (cont) - TM-9-2350-277-20-3_55
ADJUST VOLTAGE REGULATOR
TM-9-2350-277-20-3 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
12
13
14
15
16
17
18
19
20
21
22
TM 9-2350-277-20-3
REPLACE
GENERATOR
/BRACKET — Continued
0255 00
13. Install generator drive belt (WP 0253 00).
14. Adjust generator drive belt (WP 0252 00).
15.
TORQUE
SCREWS (1) SECURING GENERATOR (9) TO BRACKET (4) TO 36-38 LB-FT (49-52 N m).
FOLLOW-THROUGH STEPS
1.
Connect battery ground strap (WP 0337 00), (WP 0338 00), or (WP 0339 00).
2.
Install power plant lower rear access panel (see your -10).
3.
Install driver’s power plant access panel (see your -10).
END OF TASK
0255 00-10
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business