Home
Download PDF
Order CD-ROM
Order in Print
REMOVAL (cont) - TM-9-2350-277-20-3_509
INSTALLATION - TM-9-2350-277-20-3_511
TM-9-2350-277-20-3 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
416
417
418
419
420
421
422
423
424
425
426
TM 9-2350-277-20-3
REPLACE TRANSMISSION CONTROLLER WIRING HARNESS — Continued
0361 00
INSPECTION-ACCEPTANCE AND REJECTION CRITERIA
INSPECTION AND REPAIR
1.
Check harness
continuity
. Replace bad harness.
2.
Check leads. Replace frayed, cracked, or broken leads (WP 0382 00).
3.
Check connectors. Replace cracked or broken connectors (WP 0382 00).
INSTALLATION
1.
Place transmission controller wiring harness (11) in position near mating connectors.
2.
Install transmission controller wiring harness connector (10), four new locknuts (9), and screws (8) on driver’s
compartment bulkhead. Have helper assist.
3.
Connect transmission wiring harness (7) to bulkhead connector located inside power plant compartment.
4.
Connect wiring harness connector (5) to transmission controller (6).
0361 00-6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business