TM 9-2350-277-20-3
REPLACE ENGINE WIRING HARNESS Continued
0359 00
15. Disconnect lead (1) from oil pressure transmitter (2), and remove harness (3) from power plant.
CLEANING
CLEANING, INSPECTION, AND REPAIR
1.
Check harness for continuity.
2.
Check leads. Replace frayed, cracked, or broken leads (WP 0382 00).
3.
Check connectors.
INSTALLATION
1.
Connect lead (1) to oil pressure transmitter (2).
0359 00-8