Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
FOLLOW-THROUGH STEPS - TM-9-2350-277-20-3_488
REMOVAL - TM-9-2350-277-20-3_490
TM-9-2350-277-20-3 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
396
397
398
399
400
401
402
403
404
405
406
TM 9-2350-277-20-3
REPLACE ENGINE WIRING HARNESS
0359 00
THIS WORK PACKAGE COVERS:
Removal (page 0359 00-2).
Cleaning, Inspection, and Repair (page 0359 00-8).
Installation (page 0359 00-8).
INITIAL SETUP:
Maintenance
Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Electrical Tool Kit (WP 0926 00, Item 64)
Multimeter
(WP 0926 00, Item 30)
M
aterials/Parts
Locknut ( 2 )
Lockwasher ( 3 )
Tie strap ( 3 )
Tie strap
P
ersonnel
Required
Unit Mechanic
References
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Power plant removed (WP 0156 00)
0359 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business