Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION (cont) - TM-9-2350-277-20-3_384
REMOVAL (cont) - TM-9-2350-277-20-3_386
TM-9-2350-277-20-3 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
305
306
307
308
309
310
311
312
313
314
315
TM 9-2350-277-20-3
REPLACE BATTERY LEADS AND TERMINALS (M577A3 AND M1068A3
ONLY)
0341 00
THIS WORK PACKAGE COVERS:
Removal (page 0341 00-1).
Cleaning and Inspection (page 0341 00-3).
Installation (page 0341 00-4).
INITIAL SETUP:
Maintenance Level
Unit
T
o
ols
and
Special
T
o
ols
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Battery Wire Brush (WP 0926 00, Item 10)
Battery Terminal Puller (WP 0926 00, Item 37)
M
aterials/Parts
Grease (WP 0928 00, Item 12)
Sodium bicarbonate (WP 0928 00, Item 60)
Grommet (2)
Personnel Required
Unit Mechanic
References
See your -10
E
quipment
Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Ramp lowered (see your -10)
Battery access cover removed (see your -10)
Battery ground lead disconnected (WP 0338 00)
Personnel heater removed (for STE/ICE shunt leads
only) (WP 0703 00)
REMOVAL
WARNING
Electrical current can burn you. Disconnect ground lead before starting task.
1.
Remove screw (1), washer (2), and ground lead (3) from shunt (4).
0341 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business