TM 9-2350-277-20-2REPLACE ENGINE LIFTING BRACKET — Continued 0161 00INSTALLATION1. Install bracket (3) with two screws (1) and new lockwashers (2) on power plant.FOLLOW-THROUGH STEPS1. Lower power plant grill (WP 0464 00).2. Close power plant access door (see your -10).3. Raise trim vane (see your -10).END OF TASK0161 00-2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business