TM 9-2350-277-20-2BLOCK POWER PLANT 0157 00THIS WORK PACKAGE COVERS:Jacking (page 0157 00-1).INITIAL SETUP:Maintenance LevelUnitTools and Special ToolsGeneral Mechanic’s Tool Kit (WP 0926 00, Item 65)Power Plant Sling (WP 0926 00, Item 48)Materials/PartsLumber, 4 x 6 x 40 inch (10 x 15 x 102 cm)Lumber, 4 x 6 x 20 inch (10 x 15 x 51 cm) (2)Personnel RequiredUnit MechanicHelper (H)ReferencesSee your -10Equipment ConditionEngine stopped (see your -10)Carrier blocked (see your -10)Power plant removed (WP 0156 00)PARKINGBLOCK POWER PLANTWARNINGBlocking power plant on unlevel, soft ground can cause power plant to sink and tip over.Personnel can be injured and power plant can be damaged. Make sure to block power plant onflat, hard ground.1. Use a lifting device of at least 3,000 pounds (l,362 kg) capacity and sling to lift power plant.2. On level ground, place a 4 x 6 x 40 inch (10 x 15 x 102 cm) block (1) under motor mounts of the engine (2).3. On level ground, place two 4 x 6 x 20 inch (10 x 15 x 52 cm) blocks (3) and (4) under transmission (5).4. Lower power plant down slowly onto blocks. Have helper assist.0157 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business