ITEM
49
50
51
2-45
PREVENTIVE MAINTENANCE CHECKS AND SERVICES
Q-QUARTERLY
S-SEMIANNUALLY
A-ANNUALLY
B-BIENNIALLY
H-HOURS
MI-MILES
Q
INTERVAL
Change 4
l
l
l
ITEM TO BE
INSPECTED
Conveyor (cont.)
Projectile Racks
Canister Racks
and Fuze
Containers
Electrical System
Wring Harnesses
and Cables
PROCEDURE
I
J
K
A
B
c
D
A
B
c
D
A
B
C
Inspect for worn or damaged wear strips.
Inspect conveyor chain pads. Replace as necessary (TM 9-2350-267-10).
Repair or replace defective components as necessary (p 12-1 thru 12-28).
Inspect projectile rack for cracks, bends, twists and other damage.
Inspect locking mechanisms for damage and wear. Make sure locking mechanisms
securely hold projectile in rack.
Tighten loose screws. Replace missing screws, washers and nuts.
Repair or replace defective components (p 11-1 thru 11-11).
Inspect for cracks, bends, wear and other damage.
Tighten loose screws. Replace missing screws, washers and nuts.
Inspect restraint straps and restraint bars.
Repair or replace defective components (p 11-12 thru 11-23).
Inspect harnesses and cables for damaged insulation and deterioration (Chapter 6).
Tighten loose electrical connection mounting brackets and clamps. Check for
broken or damaged terminals and replace or repair as necessary. Ref. (p 2-50 thru
2-60).
Replace missing chassis grommets.
TM 9-2350-267-20