MAIN ENGINE COLD WEATHER STARTING - Continued
TM 9-2350-267-10
Starting the Main Engine
1.
2.
3.
4.
5.
When using winterization heater, you must stop heater before trying to start
engine. Remove and roll up tarpaulins. Secure tarpaulins with webbing as-
semblies. Install exhaust outlet plug.
Charge batteries (especially after 24 hours of winterization kit operation).
Press down on service brake pedal, pullout and down on brake lock handle,
then release handle to set brake.
Shift into neutral (N).
Move MASTER switch (1) to ON. Indicator lamp (2) will light.
6. Turn FUEL PRIME switch (3) ON for 45 seconds and release. indicator lamp
(4) will remain ON while switch is in ON position.
2-219