TM 9-2350-267-10OPERATING THE STACKER - ContinuedUsing Stacker to Unload Projectiles1.2.3.Turn on hydraulic system (p 2-129).Prepare conveyor for operation (p 2-148).Remove quick-release pin (1) securing restraint bar (2) to stacker vertical col-Pivot restraint bar downward to a position beside canister compart-Reinsert quick-release pin through restraint bar (2).umn.ment.WARNINGTo avoid injury, never operate stacker without chainguards (3) in place.4. Unlock appropriate projectile rack (p 2-184).2-167
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business