TM 9-2350-267-10
OPERATING THE STACKER - Continued
Using Stacker to Unload Projectiles
1.
2.
3.
Turn on hydraulic system (p 2-129).
Prepare conveyor for operation (p 2-148).
Remove quick-release pin (1) securing restraint bar (2) to stacker vertical col-
Pivot restraint bar downward to a position beside canister compart-
Reinsert quick-release pin through restraint bar (2).
umn.
ment.
WARNING
To avoid injury, never operate stacker without chain
guards (3) in place.
4. Unlock appropriate projectile rack (p 2-184).
2-167