TM 9-2350-261-20-1ItemNo.98Table 2-1. Unit Level Preventive Maintenance Checks and Services for M113A2 FOVIntervalSemi-AnnualItem ToBeInspectedEngineCoolantHeaterK itContinuedProcedureCheck electrical leads and connectorsat heater, at control box, and at fuelpump. Tape frayed leads. Replacedamaged connectors (page 14-1).Check heater control box, switchesand light bulb. Tighten or replace badswitches and bulb (page 32-42).Not MissionCapable If:2-124 Change 3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business