TM 9-2350-247-34REPLACE ENGINE (M548A1) — Continued 0007 00INSTALLATION1. Use a lifting device of at least 2,000 lb (908 kg) capacity and sling (1) to lift new engine from shipping container. Blockrear end of engine on level ground (see your -20).CAUTIONParts installed in Steps 2 - 59 are not supplied with new engine. These parts must be retainedfrom the old engine.2. Apply a thin coat of antiseize compound to cleaned threads of two screws (2).3. Install base (5), rubber engine mount (6), and cap (4) on support (7). Secure with two screws (2) and new keywashers (3). Tighten screws to 360-420 lb-in (41-47 N•m) torque.4. Block front of engine mount (see your -20) with wood blocks.0007 00-21
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business