1.
Remove new transmission from shipping container. See TM 9-2520-272-34&P. Set transmission on power plant stand.
Use lifting device. Have helper assist.
2.
Clean engine splined coupling (4) and transmission splined coupling grooves (5). Apply antiseize compound to splines.
3.
Move transmission (2) onto engine splined coupling (4). Install two screws (6), new lock nuts (7) and four washers (8)
holding transmission to engine flywheel housing (9). Tighten screws to 25-27 lb-ft (34-37 Nm) torque. Have helper
assist.
4.
Install 10 washers (10) and new lock screws (11) holding transmission to input housing (12). Tighten screws to
38-41 lb-ft (52-55 Nm) torque.