TM 9-2350-247-20-1
SERVICE UPON RECEIPT OF MATERIEL Continued
0127 00
M548A1/M548A3 TURN SIGNAL KIT DEPROCESSING PROCEDURES
1.
General procedures:
a.
Check material to make sure it is ready for use. Clean and prepare material for service.
b.
List missing or damaged parts and any malfunctions. Correct deficiencies.
c.
Report serious deficiencies which appear to involve unsatisfactory design or material on SF-368, Quality
Deficiencies Report.
2.
Specific procedures:
a.
Check that all parts are properly assembled and installed.
b.
Test operation of turn signal (WP 0505 00).
ADMINISTRATIVE STORAGE
1.
Instructions for administrative storage of your carrier are contained in MIL-C-62015.
END OF TASK
0127 00-6