Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: FOLLOW-ON MAINTENANCE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2350-287-34 114.  HYDRAULIC  ACTUATOR  REPAIR  (continued). 12. Install four nuts (4) and new Iockwashers (5) on four tie rods (2) at end cap (1). 13. Install four nuts (4) and Iockwashers (5) on four tie rods (2) at gland (3). 14. Torque eight nuts (4) evenly in cross-pattern style as follows: l Tighten nut A to 5 ft-lb (7 N·m) on first Cycle. Tighten nut B to 20 ft-lb (27 N·m) on second cycle. Tighten nut C to 40 ft-lb (54 N·m) on third cycle. Tighten nut D to 65 ft-lb (86 N·m) on fourth cycle. 15. Coat nonpainted areas of actuator (6) with corrosion preventive. 16. Install two protective caps (22) in gland (3) and end cap (1). FOLLOW-ON MAINTENANCE: Install hydraulic actuator (refer to TM 9-2350-287-20-2). 11-17/(1 1-18 blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business