| |
TM 9-2350-287-34
9-4.
PROJECTILE RACK SECTION REPAIR (continued).
10.
Install right locking handle (3) and left locking handle (4) and tighten two setscrews (5) on each locking handIe
(3 and 4).
11.
Secure locking handles (3 and 4) with screw (1) and new self-locking nut (2) for each locking handle (3 and 4).
d.
1.
TEST
With the aid of an assistant, install projectile rack section (13) on test stand (24).
9-19
|