| |
TM 9-2350-287-34
9-4. PROJECTILE RACK SECTION REPAIR (continued).
3.
Install two sleeve bearings (15), shaft (16), and two keys (14) on projectile rack section (13).
4.
Install lower support bar (12) on lower locking plate (8) with two screws (10) and washers (9).
5.
Install two new Iockwires (11) on lower support bar (12).
6.
Install upper support bar (12) on upper locking plate (8) with two screws (10) and washers (9).
7.
Install two new Iockwires (11) on upper support bar (12).
8.
9.
Install
Install
upper and lower locking plate (8) from projectile rack section (13).
two pivot plates (7) from projectile rack section (13) with four shoulder screws (6).
9-18
|