| |
TM 9-2350-287-34
9-4. PROJECTILE RACK SECTION REPAIR (continued).
2.
Inspect locking bar (19) and cam pin (21) for bends or looseness. Replace if necessary.
c.
ASSEMBLY
1.
Install locking shoe (20) on each locking bar (19) with two screws (17) and two new lockwashers (18).
2.
Install nine locking bars (19) on projectile rack section (13) with nine pins (21) and nine new cotter pins (22).
9-17
|