| |
TM 9-2350-287-34
9-4. PROJECTILE RACK SECTION REPAIR (continued).
17.
Remove nine cotter pins (22) and nine cam pins (21). Discard cotter pins.
18.
Remove nine locking bars (19) from projectile rack section (13).
b.
1.
CLEANING AND INSPECTION
Inspect locking shoe (20) for separation of plastisol coating (23). Replace if necessary.
9-16
|