| |
TM 9-2350-287-20-2
22-5.
HOSE ASSEMBLY REPLACEMENT (continued).
5.
Remove seven screws (74), Iockwashers (73), washers (72), and two harness guards (71) from bulkhead.
Discard Iockwashers.
6.
Remove two clamps (75) and hoses (60 and 70) from tube coupling (76).
NOTE
Straps secure more than one hose. After removing the necessary hose, loosely secure the
straps and the other hoses to the bulkhead.
7.
Remove two screws (11), Iockwashers (12), washers (13), and straps (14) securing hose (70) to bulkhead.
Discard Iockwashers.
22-18
|