Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: b. INSTALLATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2350-287-20-2 11-11.  FINAL  DRIVE  SPROCKET  AND  HUB  REPLACEMENT  (continued). 3. Remove 10 self-locking nuts (7) and screws (8) and inner sprocket (1) from hub (2). Remove two self-locking screws (3) from hub pilot holes. Discard self-locking nuts and self-locking screws. b. INSTALLATION 1. Install inner sprocket (1) on hub (2) with 10 screws (8) and new self-locking nuts (7). Torque to 90 ft-lb (122 N•m). WARNING Hub is very heavy. To prevent injury, at least two people are needed when Installing hub. NOTE Hub with inner and outer sprockets attached may be installed as an assembly by securing with eight screws. 2. Install hub (2) on drive assembly (9) with eight new self-locking screws (3). Torque screws between 450 and 475   ft-lb   (610   and   644   N•m). 3. Install outer sprocket (4) with 10 screws (5) and new self-locking nuts (122  N•m). (6) on hub (2). Torque nuts to 90 ft-lb FOLLOW-ON MAINTENANCE: • Connect track (para 11-14). 11-26

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business