Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: a. INSTALLATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2350-287-20-2 15-82.  PROJECTILE  RACK  BASE,  SUPPORTS,  AND  VEHICLE  WALL-MOUNTED RESTRAINTS  REPLACEMENT  (continued). a. INSTALLATION NOTE For correct positioning at installation, aline restraints and supports with scribe marks. Ensure that shims are installed in proper number and location. 1. Install mounting bracket (24) on rack base (30) with screw (25), new Iockwasher (26) and washer (27). 2. Install rack base (30) on vehicle floor with 16 screws (31), new Iockwashers (32), washers (33), and washer shims  (28). 3. Install two screws (21 ), new Iockwashers  (22)  and  washers (23)  on  mounting  bracket  (24). 4. Install right and left rear base supports (13) with four screws (16),  new  Iockwashers  (15), and  washers  (14). 5. Install right and left front base supports  (20)  and  two  angles (29)  on  vehicle  floor  with  10 screws (17), new lockwashers (18),  and  washers  (19). 15-201

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business