TM 9-2350-287-10PROJECTILE RACK OPERATION (continued)11. Pull rack assembly toward rear of vehicle until there is room for personnel tomove between rack assemblies and front wall.12. Using hoist (3), lower rack assembly until it rests on floor.CAUTIONWatch clearance on hydraulic lines when moving leftprojectile rack assembly.13. If only one rack assembly is to be moved, leave hook of hoist (3) attachedfor added support. If right rack assembly has been moved and left rackassembly must also be moved, relocate lifting fixture (hoist, beam, andtrolley assembly) to left side of roof. Repeat steps 7 through 12 for left rackassembly.When installing both rack assemblies, Install left rack assembly first. The left rack assembly tends to tipforward, which may cause severe injury to personnel.14. Position hoist (3), beam (1), and trolley assembly (2) over rack assembly to be moved, engaging block (13) and pin(4) with beam support legs.2-185
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business