TM 9-2350-287-10
OPERATING THE CONVEYOR (continued)
5.
Activate hydraulic pump (p. 2-131). Move CONVEYOR switch (2) to OUT.
6.
Remove a projectile from rack section (p. 2-179) and slide projectile over forward end
section (3) onto conveyor chain.
7.
Place proper propelling charge (called for by howitzer crew) onto conveyorchain behind
projectile.
8.
Howitzer personnel will remove projectiles and charges from rear end section.
9.
Repeat steps 6, 7, and 8 to unload additional ammunition, as required.
2-162
Change 1