TM 9-2350-277-20-5
REPLACE M3 NBC HEATER CONTROL BOX (M577A3 ONLY) Continued
0792 00
7.
Install cable (5), screw (17), and washer (18) on bus bar (19) in distribution box (20).
FOLLOW-THROUGH STEPS
1.
Install master switch panel (WP 0261 00).
2.
Connect battery ground lead (WP 0338 00).
END OF TASK
0792 00-3/4 blank